Los Angeles County, CA solar permits
Residential solar permits in Los Angeles County, CA were issued in a median of 12 business days in 2018, with a median permit cost of $378.
Permitting and interconnection in Los Angeles County
| Permit issued (median) | 12 business days (2018) |
|---|---|
| Inspection scheduled (median) | 53 business days (2018) |
| Utility approval before install (median) | 7 business days (2023) |
| Final interconnection to PTO (median) | 3 business days (2023) |
| Median residential permit cost | $378 |
| Online submission | Instant online permitting |
| Instant permitting | Yes (Other) |
| Same-day, over-the-counter permits | Not available |
| Structural review, systems under 10 kW | Required |
| Electrical review, systems under 10 kW | Only in some cases |
| Inspections required | 1 |
| Rough-in inspection | Required |
| Third-party plan review | No |
A Los Angeles County plan set from Ballast
Enter the address and Ballast finds the jurisdiction and the utility, pulls the aerial and parcel line, and builds the set on ANSI B: cover, site plan, roof or array plan, attachment details, line diagrams, NEC calculations, labels and spec sheets.
- Checks run under the code edition Los Angeles County has adopted, each with the article cited.
- Any correction Los Angeles County sends back becomes a rule for the jurisdiction, so the next set already answers it.
- The Solar Agent follows the permit through to approval, then moves the job on to interconnection and install.
Questions
How long does a solar permit take in Los Angeles County, CA?
The median time to issue a residential solar permit in Los Angeles County was 12 business days in 2018, according to NREL SolarTRACE.
How much does a solar permit cost in Los Angeles County?
The median residential solar permit cost in Los Angeles County is $378 (NREL SolarTRACE). Confirm the current fee schedule with the jurisdiction.
How many inspections does a solar install need in Los Angeles County?
Los Angeles County requires 1 inspection for a residential solar installation, including a rough-in inspection.
Source: SolarTRACE, National Renewable Energy Laboratory (NREL), 2025-09-09 release. Times are medians for residential solar in the year shown. Requirements change — confirm current rules, fees and forms with the jurisdiction before you submit.