Residential solar permits in Highland, CA were issued in a median of 9.5 business days in 2023, with a median permit cost of $454. Instant permitting through SolarAPP+ is available.

9.5 business daysto permit, median (2023)
9 business daysto inspection
5 business daysfinal interconnection to PTO
$454median permit cost

Permitting and interconnection in Highland

Permit issued (median)9.5 business days (2023)
Inspection scheduled (median)9 business days (2023)
Utility approval before install (median)Same day (2024)
Final interconnection to PTO (median)5 business days (2024)
Median residential permit cost$454
Online submissionInstant online permitting
Instant permittingYes (SolarAPP+)
Same-day, over-the-counter permitsAvailable
Structural review, systems under 10 kWRequired
Electrical review, systems under 10 kWNot required
Inspections required1
Rough-in inspectionNot required
Third-party plan reviewNo

SolarAPP+ in Highland

Highland issues residential solar permits instantly through SolarAPP+. Covered: PV, PV + storage, Main panel upgrade. Not covered: Main breaker derate — those go through standard plan review. The city's SolarAPP+ page.

Ballast lays out the SolarAPP+ application data in the order the form asks, so the submission is a copy-through rather than a re-type. How SolarAPP+ works.

A Highland plan set from Ballast

Enter the address and Ballast finds the jurisdiction and the utility, pulls the aerial and parcel line, and builds the set on ANSI B: cover, site plan, roof or array plan, attachment details, line diagrams, NEC calculations, labels and spec sheets.

  • Checks run under the code edition Highland has adopted, each with the article cited.
  • Any correction Highland sends back becomes a rule for the jurisdiction, so the next set already answers it.
  • The Solar Agent follows the permit through to approval, then moves the job on to interconnection and install.

Questions

How long does a solar permit take in Highland, CA?

The median time to issue a residential solar permit in Highland was 9.5 business days in 2023, according to NREL SolarTRACE.

How much does a solar permit cost in Highland?

The median residential solar permit cost in Highland is $454 (NREL SolarTRACE). Confirm the current fee schedule with the jurisdiction.

How many inspections does a solar install need in Highland?

Highland requires 1 inspection for a residential solar installation.

Source: SolarTRACE, National Renewable Energy Laboratory (NREL), 2025-09-09 release. Times are medians for residential solar in the year shown. Requirements change — confirm current rules, fees and forms with the jurisdiction before you submit.