Home › Permits › Arizona › Pinal County

Pinal County, AZ solar permits

Residential solar permits in Pinal County, AZ were issued in a median of 17 business days in 2024, with a median permit cost of $199.

17 business daysto permit, median (2024)
10 business daysto inspection
8 business daysfinal interconnection to PTO
$199median permit cost

Permitting and interconnection in Pinal County

Permit issued (median)17 business days (2024)
Inspection scheduled (median)10 business days (2024)
Utility approval before install (median)4 business days (2024)
Final interconnection to PTO (median)8 business days (2024)
Median residential permit cost$199
Online submissionOnline portal or email
Instant permittingNot available
Same-day, over-the-counter permitsNot available
Structural review, systems under 10 kWNot required
Electrical review, systems under 10 kWNot required
Rough-in inspectionNot required

A Pinal County plan set from Ballast

Enter the address and Ballast finds the jurisdiction and the utility, pulls the aerial and parcel line, and builds the set on ANSI B: cover, site plan, roof or array plan, attachment details, line diagrams, NEC calculations, labels and spec sheets.

  • Checks run under the code edition Pinal County has adopted, each with the article cited.
  • Any correction Pinal County sends back becomes a rule for the jurisdiction, so the next set already answers it.
  • The Solar Agent follows the permit through to approval, then moves the job on to interconnection and install.

Questions

How long does a solar permit take in Pinal County, AZ?

The median time to issue a residential solar permit in Pinal County was 17 business days in 2024, according to NREL SolarTRACE.

How much does a solar permit cost in Pinal County?

The median residential solar permit cost in Pinal County is $199 (NREL SolarTRACE). Confirm the current fee schedule with the jurisdiction.