Arlington County, VA solar permits

Residential solar permits in Arlington County, VA were issued in a median of 7 business days in 2022, with a median permit cost of $104.

7 business daysto permit, median (2022)
6 business daysto inspection
12 business daysfinal interconnection to PTO
$104median permit cost

Permitting and interconnection in Arlington County

Permit issued (median)7 business days (2022)
Inspection scheduled (median)6 business days (2023)
Utility approval before install (median)3 business days (2024)
Final interconnection to PTO (median)12 business days (2024)
Median residential permit cost$104
Online submissionOnline portal or email
Instant permittingNot available
Same-day, over-the-counter permitsAvailable
Structural review, systems under 10 kWRequired
Electrical review, systems under 10 kWNot required
Inspections required2
Rough-in inspectionRequired
SolSmart designationBronze

A Arlington County plan set from Ballast

Enter the address and Ballast finds the jurisdiction and the utility, pulls the aerial and parcel line, and builds the set on ANSI B: cover, site plan, roof or array plan, attachment details, line diagrams, NEC calculations, labels and spec sheets.

  • Checks run under the code edition Arlington County has adopted, each with the article cited.
  • Any correction Arlington County sends back becomes a rule for the jurisdiction, so the next set already answers it.
  • The Solar Agent follows the permit through to approval, then moves the job on to interconnection and install.

Questions

How long does a solar permit take in Arlington County, VA?

The median time to issue a residential solar permit in Arlington County was 7 business days in 2022, according to NREL SolarTRACE.

How much does a solar permit cost in Arlington County?

The median residential solar permit cost in Arlington County is $104 (NREL SolarTRACE). Confirm the current fee schedule with the jurisdiction.

How many inspections does a solar install need in Arlington County?

Arlington County requires 2 inspections for a residential solar installation, including a rough-in inspection.

Source: SolarTRACE, National Renewable Energy Laboratory (NREL), 2025-09-09 release. Times are medians for residential solar in the year shown. Requirements change — confirm current rules, fees and forms with the jurisdiction before you submit.