Residential solar permits in Cary, NC were issued in a median of 7.5 business days in 2023.
Permitting and interconnection in Cary
| Permit issued (median) | 7.5 business days (2023) |
|---|---|
| Inspection scheduled (median) | 13 business days (2023) |
| Utility approval before install (median) | 6 business days (2024) |
| Final interconnection to PTO (median) | 3 business days (2024) |
| Online submission | Online portal or email |
| Instant permitting | Not available |
| Same-day, over-the-counter permits | Not available |
| Structural review, systems under 10 kW | Required |
| Electrical review, systems under 10 kW | Required |
| Inspections required | 3 |
| Rough-in inspection | Required |
| SolSmart designation | Gold · 3-day permit commitment |
A Cary plan set from Ballast
Enter the address and Ballast finds the jurisdiction and the utility, pulls the aerial and parcel line, and builds the set on ANSI B: cover, site plan, roof or array plan, attachment details, line diagrams, NEC calculations, labels and spec sheets.
- Checks run under the code edition Cary has adopted, each with the article cited.
- Any correction Cary sends back becomes a rule for the jurisdiction, so the next set already answers it.
- The Solar Agent follows the permit through to approval, then moves the job on to interconnection and install.
Questions
How long does a solar permit take in Cary, NC?
The median time to issue a residential solar permit in Cary was 7.5 business days in 2023, according to NREL SolarTRACE.
How many inspections does a solar install need in Cary?
Cary requires 3 inspections for a residential solar installation, including a rough-in inspection.
Source: SolarTRACE, National Renewable Energy Laboratory (NREL), 2025-09-09 release. Times are medians for residential solar in the year shown. Requirements change — confirm current rules, fees and forms with the jurisdiction before you submit.