Home › Permits › Colorado › Denver city & County

Denver city & County, CO solar permits

Residential solar permits in Denver city & County, CO were issued in a median of same day in 2024, with a median permit cost of $50. Instant permitting through SolarAPP+ is available.

same dayto permit, median (2024)
14 business daysto inspection
4 business daysfinal interconnection to PTO
$50median permit cost

Permitting and interconnection in Denver city & County

Permit issued (median)Same day (2024)
Inspection scheduled (median)14 business days (2024)
Utility approval before install (median)7 business days (2024)
Final interconnection to PTO (median)4 business days (2024)
Median residential permit cost$50
Online submissionInstant online permitting
Instant permittingYes (SolarAPP+)
Same-day, over-the-counter permitsAvailable
Structural review, systems under 10 kWRequired
Electrical review, systems under 10 kWOnly in some cases
Inspections required2
Rough-in inspectionRequired
SolSmart designationGold · 3-day permit commitment

SolarAPP+ in Denver city & County

Denver city & County issues residential solar permits instantly through SolarAPP+. Covered: PV, PV + storage, Main panel upgrade, Main breaker derate. The city's SolarAPP+ page.

Ballast lays out the SolarAPP+ application data in the order the form asks, so the submission is a copy-through rather than a re-type. How SolarAPP+ works.

A Denver city & County plan set from Ballast

Enter the address and Ballast finds the jurisdiction and the utility, pulls the aerial and parcel line, and builds the set on ANSI B: cover, site plan, roof or array plan, attachment details, line diagrams, NEC calculations, labels and spec sheets.

  • Checks run under the code edition Denver city & County has adopted, each with the article cited.
  • Any correction Denver city & County sends back becomes a rule for the jurisdiction, so the next set already answers it.
  • The Solar Agent follows the permit through to approval, then moves the job on to interconnection and install.

Questions

How long does a solar permit take in Denver city & County, CO?

The median time to issue a residential solar permit in Denver city & County was same day in 2024, according to NREL SolarTRACE.

How much does a solar permit cost in Denver city & County?

The median residential solar permit cost in Denver city & County is $50 (NREL SolarTRACE). Confirm the current fee schedule with the jurisdiction.

How many inspections does a solar install need in Denver city & County?

Denver city & County requires 2 inspections for a residential solar installation, including a rough-in inspection.

Source: SolarTRACE, National Renewable Energy Laboratory (NREL), 2025-09-09 release. Times are medians for residential solar in the year shown. Requirements change — confirm current rules, fees and forms with the jurisdiction before you submit.