How to answer a solar plan-check correction letter

How to sort the comments, fix the set, and write a response the reviewer can approve on the next pass.

Ballast Solar · Updated September 2026

Read the letter as a list of jobs

A correction letter is usually a numbered list of comments, each tied to a sheet and often to a code section. Before changing anything, sort every comment into one of four kinds:

  1. Drawing change — move, add or redraw something on a sheet.
  2. Calculation — a number is wrong or not shown.
  3. Documentation — a spec sheet, letter, form or listing is missing.
  4. Clarification — the design is right but the reviewer can’t see why. These are answered with a note or a code reference, not a redesign.

The corrections that come up most

CommentUsual fixWhere to look
Fire pathways or ridge setbackRedraw the array to the adopted pathway widths and ridge setbackIRC R324.6, IFC, local fire code
Point of connectionShow the busbar math, derate the main, or move to a supply-side tapNEC 705.12 / 705.11
Rapid shutdownShow the devices on the line diagram and add the labelsNEC 690.12, 690.56(C)
String voltageRecalculate at the record low temperature for the siteNEC 690.7
Conductor or OCPD sizingResize with derates and make every sheet agreeNEC 690.8, 310.16, 240.4
Labels or directoryAdd the missing label and its location, and the source directoryNEC 690, 705.10, 706
Spec sheet or listingAttach the data sheet showing the listingUL 1741, 2703, 9540, 61730
StructuralAdd the span-table check or an engineer’s letterRacking span table, IRC R324
Battery locationMove it, add protection, or document spacing and limitsIRC R328, NEC 706

Revise the set so the reviewer can check it fast

  • Cloud every change and tag it with a revision number (a delta triangle) that matches the title block.
  • Update the revision block on every sheet you touch, with the date and a one-line description.
  • Keep sheet numbers the same. If you add a sheet, add it to the index rather than renumbering everything.
  • Make the numbers agree everywhere. A conductor you resize on the line diagram has to change on the calculation sheet and the conductor schedule too, or the next round will catch it.

Write a comment-by-comment response

Answer the letter in its own order and numbering. For each comment:

  1. Quote or paraphrase the reviewer’s comment.
  2. Say what you did in one or two sentences.
  3. Point to the sheet and detail where it now appears.

Where you disagree, say so politely and cite the code section and edition that supports the design. Reviewers generally accept a clear reference; they rarely accept silence. Put the letter on company letterhead and resubmit it with the revised set.

Make sure it doesn’t happen twice

Most correction letters repeat. The same city will ask for the same label wording or the same pathway note on the next job. Keep every comment you get as a rule for that jurisdiction, and check the next set against it before it goes out.

How Ballast Solar handles corrections

Ballast Solar turns a correction letter into a revised set and a drafted response, usually the same day, and remembers what each jurisdiction asked for so the next set you file there already answers it.

Questions

How do I respond to a solar plan check correction?

Fix each comment on the drawings, cloud the changes and update the revision block, then send a comment-by-comment response letter that says what changed and on which sheet, with the revised set.

What are the most common solar plan check corrections?

Fire pathways and ridge setbacks, the point of connection and busbar rule, rapid-shutdown devices and labels, string voltage at the record low temperature, conductor sizing, missing labels or spec sheets, and structural documentation.

Can I push back on a plan check comment?

Yes. If the design complies, say so politely in the response letter and cite the code section and the edition the jurisdiction has adopted. A specific reference usually settles it.

What is a revision cloud on a plan set?

A scalloped outline drawn around each change, tagged with a revision number that matches the title block, so the reviewer can find exactly what changed.

This guide explains the code for planning purposes. The adopted edition, local amendments and the AHJ’s interpretation govern; the contractor of record is responsible for the design.